Project: DaveBellairs   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Dave Bellairs   -  
Project:   Vans - RV-7   -   VIEW REPORTS
Total Hours:1467.9
Total Flight Time:
Start/Last Date:Jun 24, 2017 - No Finish Date
Engine:Lycoming IO-360
Propeller:Whirlwind 200RV
Panel:Advanced Flight Systems Avionics
 
Friendly URL: https://eaabuilderslog.org?s=DaveBellairs

Home or Last Project Picture

Aug 15, 2023     Tail light installation - (3 hours)       Category: Lighting
Added a pigtail to the FlyLeds tail light using some extra 18 AWG wire I had. Pulled out the bottom rudder fairing and installed the tail light. Super tight working quarters at the aft end of the bottom rudder fairing. Had to trim the interior of the fairing to allow installation of the aluminum backer. Not sure if I need the exterior aluminum plate or not. Sent an email to Paul at FlyLeds to determine a good course of action. Tested the light with a 9 volt battery and it worked great. Big warning about not using a 12 volt battery.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.